Welcome to aubaine.ca!
Welcome to aubaine.ca!
York Energy Centre, electricians, wiring in Newmarket.
York Energy Centre is a natural gas-fired electricity generation facility located at 18765 Dufferin St, northwest of Newmarket in the Township of King, Ontario. Electricity produced here is supplied under contract to Ontario's grid operator through 2035, which places the facility firmly in the province's energy infrastructure rather than in the realm of a retail or walk-in business. General inquiries can be directed to 905-853-4451.
Anyone contacting York Energy Centre should know from the outset that it is an industrial power generation site rather than a service counter or showroom, so day-to-day questions about billing, outages or residential electricity supply are better directed to a local utility or the provincial grid operator than to the plant itself. People who do reach out to a facility like this are typically researchers, students, journalists, municipal representatives or residents of the surrounding township who want information about operations, environmental performance or community involvement rather than a service quote.
Because Ontario's electricity system draws on a mix of natural gas plants, hydroelectric stations, nuclear stations, and a growing number of wind, solar and battery storage projects, comparing this type of site to others in the region mostly comes down to understanding what role each one plays. Some assets run continuously to provide steady baseload power, others sit ready to respond quickly when demand spikes, and a growing number simply store energy for later use. York Energy Centre falls into the flexible, fast-response category, built to start up and adjust its output relatively quickly rather than run at one constant level around the clock. Keeping that distinction in mind is the most useful thing to know before trying to compare it with other generation or storage sites nearby, since each type of asset is judged by a different standard rather than by size or visibility alone.
Those upgrades were also intended to improve turbine efficiency and reduce nitrogen oxide emissions from the generation process, a detail that matters for neighbours tracking the site's environmental footprint over time.
Beside the main generation building, a battery energy storage system commissioned in August 2025 can hold and release up to 120 megawatts of power, with electrical output sustained for as long as four hours at a stretch. This addition lets the site help smooth out short-term swings in electricity supply and demand rather than relying on turbine output alone. Separately, the facility has been selected to take part in a hydrogen blending feasibility study, testing mixes of roughly five to fifteen percent hydrogen with natural gas to evaluate how the turbines handle changes in performance, maintenance needs, emissions, and fuel procurement and storage. On the employment side, the site supports nine permanent positions and contributes an estimated $71,000 in property tax each year to the local tax base, funding that flows toward roads, infrastructure and community services in the surrounding township. The operation also takes part in local community giving, supporting food security programs, hospice care providers and community associations in the area around Newmarket and King Township.
Facilities of this kind see the heaviest call on their output during the coldest stretches of winter and the hottest days of summer, when household and business electricity use across York Region and the wider provincial grid climbs sharply. A January cold snap that pushes heating systems into overdrive or a July heat wave that fills homes and offices with air conditioning both create the kind of short-term demand spikes that flexible, fast-response generation is meant to cover. Outside those peak windows, output typically eases back, since the plant's role is to respond to grid conditions as they change rather than to run at one constant level year-round.
This pattern also shapes when the site tends to draw outside attention. Public interest often rises after major upgrade announcements, during periods of provincial energy policy discussion, or when nearby communities are following local infrastructure and environmental news more closely than usual. Weekday business hours remain the most realistic window for any general inquiry, since the facility does not operate as a public-facing venue at any point in the year, whether during a quiet spring week or the peak demand of a midsummer heat wave.
No visitor parking or public transit stop is associated with the facility. As an active energy infrastructure site, access is limited to authorized personnel, and any site visit would need to be arranged directly rather than through a general drop-in.
The site is not set up for public visits in any season. It operates year-round as a working power generation facility, with winter and summer both counted among its busiest periods for electricity output rather than as times for public access.
No. York Energy Centre is an industrial generation facility built to supply electricity to the provincial grid, not a venue for gatherings, tours or celebrations of any kind.
Ontario's grid draws on a mix of natural gas, hydroelectric, nuclear, wind, solar and battery storage assets spread across the province, each contributing a different role, from steady baseload supply to fast-response backup to short-term energy storage. A facility like this one represents the flexible, fast-response side of that mix rather than a single stand-alone alternative to compare it against directly.
York Energy Centre is listed under “Electricians, wiring” of the Canadian business directory, in Newmarket. Details, products and services on its website. Contact: 905-853-4451.
Not published yet — the owner can add them by claiming this listing.
Regular gasoline, Toronto East — 182.1 ¢ (market average, week of August 31, 2026)
| Station | Address | Distance |
|---|---|---|
| Petro-Canada | 4.5 km | |
| Husky | 4.6 km | |
| Canadian Tire | 4.8 km | |
| Canadian Tire | 5.1 km | |
| Esso | 6.2 km |
Station locations: © OpenStreetMap contributors (ODbL). Prices: Government of Ontario weekly fuel price survey — a market average, not the price at this station.
No review yet for this business. Be the first to share your experience.
💛 Our promise: helping you save. Despite all the care we put into tracking prices, we simply cannot guarantee they are accurate at all times — they come from flyers and merchants and can change without notice. Every week, we work to give you a fair and reliable picture so you can follow your products, spot real discounts and buy at the right time, at the best price. At aubaine.ca, every dollar saved matters: our mission is to hunt down the best deals for you. Always confirm the final price in store or with the merchant.
Every comment gets read. That is how aubaine.ca improves.
Grow with us and earn deals
Subscribe and get the weekly flyers, coupons and best deals. Members earn Aubaine Points with every action — reviews, feedback, purchases — and climb through the tiers.
Double opt-in by email · one-click unsubscribe.